You are here: Home > Client News » Wallwork Group

Wallwork Group

Click image to download high res copy - Journalist and media use only (see Copyright for restrictions)

1) L to R: Peter Henning and Jan Soderstrom (Quintus), Simeon Collins & Ian Griffin (Wallwork), Tom Walsh (Quintus)

1) L to R: Peter Henning and Jan Soderstrom (Quintus), Simeon Collins & Ian Griffin (Wallwork), Tom Walsh (Quintus)

2) AS9100 certification means we will be in front of the curve and ready to provide the high service standards expected by aerospace and all other manufacturers

2) AS9100 certification means we will be in front of the curve and ready to provide the high service standards expected by aerospace and all other manufacturers

2) L-R: Peter Henning (Quintus), Simeon Collins (Wallwork), Jan Soderstrom (Quintus), Ian Griffin (Wallwork)

2) L-R: Peter Henning (Quintus), Simeon Collins (Wallwork), Jan Soderstrom (Quintus), Ian Griffin (Wallwork)

3) Plans are already in hand for the installation of a second Quintus Technologies HIP at the Wallwork HIP Centre

3) Plans are already in hand for the installation of a second Quintus Technologies HIP at the Wallwork HIP Centre

5) The Wallwork HIP Centre adds much needed UK based hot isostatic pressing capacity for metal component manufacturers.

5) The Wallwork HIP Centre adds much needed UK based hot isostatic pressing capacity for metal component manufacturers.

Contact
PR Services
Newsletter Sign Up
© Ainsworth Maguire PR