You are here: Home > Client News » ABM Precast Solutions

ABM Precast Solutions

Click image to download high res copy - Journalist and media use only (see Copyright for restrictions)

1) The first application for the 14.5 metre Opti-Cadre is on the new Newry to Dundalk section of the A1/N1 Dublin to Belfast motorway.

1) The first application for the 14.5 metre Opti-Cadre is on the new Newry to Dundalk section of the A1/N1 Dublin to Belfast motorway.

2) The pioneering Opti-Cadre design maximises available headroom and is able to span twin rail tracks.

2) The pioneering Opti-Cadre design maximises available headroom and is able to span twin rail tracks.

Contact
PR Services
Newsletter Sign Up
© Ainsworth Maguire PR